This two phase project significantly increased Rio Tinto’s annual export capacity. The Cape Lambert Marine Works project involved construction of a new port facility adjacent to the existing Cape Lambert Port terminal.
This included the construction of a 920 metre jetty and 440 metre two-berth wharf with 18 berthing dolphins, new ship loading facilities, piping and associated works. The structure was designed to maximise modularisation of the works in order to reduce the site man hours.