DEVIL CREEK DEVELOPMENT PROJECT WA

    The specific scope of works, included the construction of an onshore processing facility comprising gas treatment/dehydration, condensate liquid stabilisation, and storage and gas compression.

    Our Heavy Lift team overcame a multitude of challenges, including remote operations and harsh weather including record cyclone activity and 50 degree temperatures to successfully and safely complete the Installation of 78 Modules ranging from 100 to 350 Tonne,

    Despite such challenges, the Heavy Lift operation was delivered well ahead of time, to a high standard and well within budget.

    devil-creek_0048

    • Previous Project
    Share Share Share Pin
    Bob Fitz Logo

    Bob Fitz Enterprises Pty Ltd
    P: +61 419 167 559
    E: bobf@bobfitz.com.au

    PO Box 63, Aitkenvale
    QLD 4812 Australia
    ABN 19 159 320 760

    © 2026 Bob Fitz Enterprises Pty Ltd. Powered by Think BIG Creative. All Rights Reserved.

    • linkedin
    Close Menu
    • Home
    • About Us
    • Capabilities
    • Projects
    • Contact Us
      • linkedin