The specific scope of works, included the construction of an onshore processing facility comprising gas treatment/dehydration, condensate liquid stabilisation, and storage and gas compression.
Our Heavy Lift team overcame a multitude of challenges, including remote operations and harsh weather including record cyclone activity and 50 degree temperatures to successfully and safely complete the Installation of 78 Modules ranging from 100 to 350 Tonne,
Despite such challenges, the Heavy Lift operation was delivered well ahead of time, to a high standard and well within budget.